![]() If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies).Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. Preview Description INTERACTIVE COURSE FOR MEMBERS WITH CRANE LIFT PLAN RESPONSIBILITIES The aim of this highly interactive elearning course is to instruct. The lift plan must include: The type, size, model, lifting capacity, certification date and serial number of the crane to be used. ![]() ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |